THE SOLUTION
Adjusting the interconnection point
After an in-depth evaluation of the site, our expert installation team found a solution to alter the connection point to the grid in order to link the school’s 100kW solar system, enabling the school to reach their sustainability goals and raising more awareness amongst the students towards a greener future.