Driving a Greener Future: How Unified Energy is Powering the Tony White Group’s Nationwide Transition
With dozens of dealerships stretching from Tasmania to North Queensland, TWG faced a
fragmented energy landscape. Each site had different peak demands and local grid
constraints. The goal was simple but ambitious:
reduce operational costs while future-proofing the business for a low-carbon economy.
As seen in recent project data, the focus has been on high-impact regions like Queensland and Melbourne, where daylight hours offer the highest ROI for solar
investment.

Projects ranging from agile 6kW setups for small offices to massive 99kW+ industrial-grade arrays for major service hubs (such as McLeod St).

By grouping installations (such as the Mulgrave Rd cluster), Unified Energy ensured minimal disruption to dealership operations while maximising local logistics.

The systems were designed not just for today's lighting needs, but to support the heavy load of future electric vehicle fleets.
Sustainability isn’t a “one and done” project. The partnership between Unified Energy and Tony White Group is a long-term commitment. With a significant portion of the network already “green”, the roadmap extends deep into 2026 and 2027

Integrating battery solutions to capture excess solar for use during evening peak times.

Deploying fast-charging stations across dealerships to meet the rising demand for electric cars.

Real-time data tracking to ensure every kilowatt generated is utilised efficiently.
AI Assistant